Well was killed on Tuesday 14th November 2023 at about 4:51 pm.
JIV was conducted, and cause of Spill was as a result of a leak from a previously repaired point on the lower master valve nipple, (Equipment Failure).
Wednesday 15th November 2023.
The Joint Investigation Visit form was signed by the JIT and cause of spill accepted by all parties.
Discussion is ongoing on the cleanup of impacted areas.